Tunnels – ÌÇÐÄÊÓÆµ Wed, 06 May 2026 09:18:29 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.1 /wp-content/uploads/2024/12/favicon.png Tunnels – ÌÇÐÄÊÓÆµ 32 32 Ramban – Banihal /ongoing-projects/ramban-banihal/ Thu, 13 Feb 2025 14:43:29 +0000 https://staging.thinklittlebig.in/ceigall/?post_type=ongoing-projects&p=1589

Ramban – Banihal

EPC
Tunnels
Jammu & Kashmir

The construction of four-laning for part of the Ramban to Banihal section of NH-1A (now NH-44), spanning from Ch.158+675 to Ch.164+660 (North Bound) and Ch.160+282 to Ch.163+368 (South Bound, connecting with the existing Tunnel-T4), excluding Ch.161+544 to Ch.164+100 (North Bound), also includes the construction of a twin-tube tunnel (Package-II) in the Union Territory of Jammu & Kashmir, under EPC mode.

The project has reached its second milestone, which includes the breakthrough of the twin tunnels, with excavation progressing 185 meters in a single phase. Additionally, we are completing 950 meters of concrete lining each month.

]]>
Ramban – Banihal /ongoing-projects/ramban-banihal-2/ Thu, 13 Feb 2025 14:42:10 +0000 https://staging.thinklittlebig.in/ceigall/?post_type=ongoing-projects&p=2864

Ramban – Banihal

EPC
Elevated Road
Jammu & Kashmir

Construction of a four-lane highway for a portion of the Ramban to Banihal section of NH-1A (now NH-44) in the Union Territory of Jammu & Kashmir on EPC mode. The scope of work spans from Ch. 165+092 to Ch. 171+855 (North Bound) and from Ch. 166+895 to Ch. 173+638 (South Bound), with certain sections excluded from Ch. 166+610 to Ch. 167+150 (North Bound), Ch. 168+425 to Ch. 168+935 (South Bound), Ch. 167+960 to Ch. 168+168 (North Bound), and Ch. 169+745 to Ch. 169+951 (South Bound). This project is being executed under Package-III on EPC mode.

The project has achieved its first milestone, with the recent completion of a viaduct spanning 450 meters in length.

]]>