Solar Power – ÌÇÐÄÊÓÆµ Fri, 08 May 2026 06:55:49 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.1 /wp-content/uploads/2024/12/favicon.png Solar Power – ÌÇÐÄÊÓÆµ 32 32 Solar Power Procurement – MSKVY 2.0 (190 MW) /ongoing-projects/solar-power-procurement-mskvy-2-0-190-mw/ Fri, 08 May 2026 06:50:12 +0000 /?post_type=ongoing-projects&p=5462

Solar Power Procurement – MSKVY 2.0 (190 MW)

HAM
Solar Power
Maharashtra

Procurement of 190 MW Solar Power under Mukhyamantri Saur Krushi Vahini Yojana 2.0 (Round-1) in Maharashtra is being executed for MSEDCL. The project commenced following LOA dated 02 October 2025 and is in progress.

]]>
Solar Power Procurement – MSKVY 2.0 (147 MW) /ongoing-projects/solar-power-procurement-mskvy-2-0-147-mw/ Fri, 08 May 2026 06:45:20 +0000 /?post_type=ongoing-projects&p=5467

Solar Power Procurement – MSKVY 2.0 (147 MW)

HAM
Solar Power
Maharashtra

Procurement of 147 MW Solar Power under Mukhyamantri Saur Krushi Vahini Yojana 2.0 (Round-2) in Maharashtra is underway for MSEDCL. The project was awarded on 02 October 2025 and is currently under execution.

]]>
Morena Solar Park – 600 MWAC Solar PV Project with BESS /ongoing-projects/morena-solar-park-600-mwac-solar-pv-project-with-bess/ Fri, 08 May 2026 06:40:58 +0000 /?post_type=ongoing-projects&p=5472

Morena Solar Park – 600 MWAC Solar PV Project with BESS

HAM
Solar Power
M.P

The Development of a 600 MWAC grid-connected ground-mounted Solar Photovoltaic Project with Battery Energy Storage Systems (BESS), ensuring 440 MW of peak power supply at Morena Solar Park, Madhya Pradesh, is currently underway. The LOA was issued on 09 February 2026 and the project is in the development phase.

]]>
Solar PV Power Plants – PM KUSUM-C (130 MW) /ongoing-projects/solar-pv-power-plants-pm-kusum-c-130-mw/ Fri, 08 May 2026 06:15:42 +0000 /?post_type=ongoing-projects&p=5510

Solar PV Power Plants – PM KUSUM-C (130 MW)

HAM
Solar Power
M.P

Development of 130 MW grid-connected Solar PV Power Plants under the Surya Mitra Krishi Feeders Scheme in Madhya Pradesh is being executed for MPUVN. The LOA was issued on 22 December 2025 and the project is currently progressing.

]]>