Flyovers & Bridges – ÌÇÐÄÊÓÆµ Tue, 11 Mar 2025 04:57:47 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.2 /wp-content/uploads/2024/12/favicon.png Flyovers & Bridges – ÌÇÐÄÊÓÆµ 32 32 River Begna – Omla High Level Bridge /completed-projects/river-begna-omla-high-level-bridge/ Thu, 13 Feb 2025 12:55:18 +0000 https://staging.thinklittlebig.in/ceigall/?post_type=completed-projects&p=2625

River Begna – Omla High Level Bridge

EPC
Flyovers & Bridges
Haryana

The project involves the planning, design, construction, defect liability, maintenance, and all other works related to the construction of two high-level bridges and their approaches, parallel to the existing bridges, over the River Begna at Km 30+500 and the River Omla at Km 16+400 on NH-72 (now New NH 344 & 7) in Haryana. The project was executed on an EPC basis.

]]>